RFQ: Landscaping Services
The contractor is responsible for installing gravel driveways, topsoil, and sod at two specific properties in Conklin. This includes subgrade preparation, grading for drainage, and maintaining sod until established.
- On-site
- Conklin, AB
- Posted Sep 8, 2026
- Apply by Oct 8, 2026
- 1 position
Opens an external site
More jobs you can apply to directly
Similar opportunities posted by employers hiring on Jobs.ca, with no external application form.
Bédard Ressources Humaines
Analyste financier(ère) #1208
- Hybrid
Centre de services scolaire de Montréal
TECHNICIENNES ET TECHNICIENS EN ADMINISTRATION, ATTRACTION ET ACQUISITION DE TALENTS
- On-site
9261-5129 QUEBEC INC.
chauffeur-livreur/chauffeuse-livreuse
- On-site
Job summary
Facebook Twitter Like Posted Date: September 08, 2026 Closing date: September 15, 2026 Position type: Contract Status: Accepting Applications Description The Conklin Resource Development Advisory Committee (“CRDAC”) is requesting a quote from a qualified contractor/company (the “Contractor”, herein) to complete landscaping services within Conklin. Timeline Must be able to start on or before September 21, 2026, based on an authorization to proceed by September 16, 2026. Completion by October 20, 2026. Expectations The Scope of Work for 111 and 139 Pine Lane includes: Supply and install of driveways for each lot, using 40mm compacted gravel (or equivalent). The total amount of gravel required is approximately 689 m2 at a 150 mm depth for a total volume of approximately 103 m3. Below is the lot breakdown for gravel: 111 Pine Lane: 255 m2 139 Pine Lane: 434 m2 Gravel driveways are outlined on each plot plan in orange highlight. Driveways to be compacted using a mechanical tamper and moisture conditioning to achieve a solid, erosion resistance surface. Includes all required subgrade preparation (clean-up, grading, compaction) prior to the construction of the driveways. Supply and install of topsoil and sod for each lot. The total area requiring topsoil is approximately 2,005 m2 at a 100 mm depth for a total volume of approximately 200 m3. The total area requiring sod is approximately 2,005 m2. Below is the lot breakdown for area: 111 Pine Lane: 870 m2 139 Pine Lane: 1,135m2 Topsoil and sod areas are outlined on each plot plan in green highlight. Includes watering and maintenance until sod is established. Includes any necessary grading of the existing ground to achieve drainage away from the home, towards right-of ways or natural/existing drainage channels. Re-establish and define existing drainage channel along the south edge of 139 Pine Lane to drain towards the road drainage ditch without obstruction. Any necessary route/haul permitting is to be completed by the Contractor. Please click below to view/download the plot plans for each property: PLOT PLAN 111 Pine Lane PLOT PLAN 139 Pine Lane Requirements The Contractor shall ensure it meets the following criteria and requirements: A valid business license to operate in the Regional Municipality of Wood Buffalo. A locally owned and operated business is preferred; Must have experience and necessary equipment to complete the service; Must have a minimum of $2,000,000 liability insurance policy and adequate insurance on any vehicle or equipment necessary to fulfill the requirements of the service. A copy of this insurance policy must be made available to CRDAC upon request; and Workers’ Compensation Board (“WCB”) Clearance. Payment Terms The Contractor shall provide an invoice to the CRDAC for services rendered on a mutually agreed basis. An execution of a service agreement will be required. Independent Contractor The Contractor shall act as an independent contractor and not as an employee of CRDAC. Submission Guidelines Please include the following: Date of submission Company Name and Address (no P.O. Boxes) Contact information including the contact name, phone number, and email address Contractor MUST provide pricing separated by property and scope item as follows: 111 Pine Lane Driveway Construction $_________ Topsoil & Sod Installation $_________ 139 Pine Lane Driveway Construction $_________ Topsoil & Sod Installation $_________ Regrading Drainage Ditch $_________ Bids not submitted in this format will not be accepted Proposed timeline – available start and completion date How To Submit a Quote If you are interested in providing this service to the CRDAC, please submit your quote to [email protected]. Feel free to reach out to us if you have any questions or require additional information. Please submit by end of day on Tuesday, September 15, 2026.
What you’ll do
The contractor is responsible for installing gravel driveways, topsoil, and sod at two specific properties in Conklin. This includes subgrade preparation, grading for drainage, and maintaining sod until established.
Requirements
Applicants must have a valid business license for the Regional Municipality of Wood Buffalo, WCB clearance, and a minimum of $2,000,000 liability insurance. Experience and the necessary equipment to complete the specified landscaping scope are required.
Listed skills
- OrganizationPreferred
- preparationPreferred
- Attention to detailPreferred
- ExecutionPreferred
- DevelopmentPreferred
- maintenancePreferred
- emailPreferred
Other relevant skills
Identified from the job description. Confirm important requirements above.
- Landscaping
- Driveway Construction
- Grading
- Sod Installation
- Topsoil Application
- Drainage Management
- Equipment Operation
- Subgrade Preparation
- Moisture Conditioning
- Mechanical Tamping
Job areas
- Construction
- Trades
- Environmental & Sustainability
Additional details
- Minimum experience
- 2+ years
- Apply by
- Oct 8, 2026
- Posting language
- English
- Working hours
- 40 hours per week
- Seniority
- Entry level